1 |
Weetabix (EA), 200kW System, Phase 1 (Grid Tied), Phase 2 (Ongoing – Backup). Locally delivered, January 2022. Designed and Delivered by Kenyan Company Questworks. Main Sub-contractor: Swiftmove logistics Ltd |
2 |
Alkira Residence, Kileleshwa, Nairobi. Sub-contracted by Questworks Limited, 122,664 sq.ft. Status: Ongoing |
3 |
Suswa – Isinya Transmission Project, 102km, 400kv Double Circuit Overhead Transmission Line. Under Jyoti Structures Limited. |
4 |
Proposed Construction of Eldoret Arboretum and Beautification under County Government of Uasin Gishu. Value of Work: 90m. Status: Completed |
5 |
Proposed Construction of Market Shades, Restaurants, Water Tank Towers, and Market Office at Jukali Market in Uasin Gishu County, 99,456 sq. ft. Project Value: 45m. Status: Completed |
6 |
Digital Plaza Umoja 4g Works, Kakamega 4g Works, Kericho 4g Works, Mumias 4g Works, Kisii Hills 4g Works, Daphton 4g Works, Kisumu 4g Works, Kiboswa Hills 4g Works, Eldoret 4g Works. Contracted by Adpower Limited |
7 |
Plant Construction Services – Cheromit ATC, Construction Services Mihango to Chokaa 4g, Const Services – Oasis Bomet ATC, Const Services Tala Machakos 4g. Contracted by Adpower Limited |
8 |
Project: Kesses Solarn1, Capacity: 40mw. Client: Alten Kenya Solar Firm. EPC Contractor: Voltalia PV Plant. Main Contractor: Trina Solar. Substation Main Contractor: Efacec Limited. Sub-contractor: Swiftmove Logistics Limited |
9 |
Lessos Tororo, 132km, 400kv Double Circuit Overhead Transmission Line. Under ABENGOA INABENSA. Scope: Tower Foundation, Erection & Installation of Line Material |
10 |
Parallelfour Hostels, Madaraka, Nairobi, 102,572 sq.ft. Status: Completed |
11 |
Proposed partitioning of Agricultural Farmers Cooperation building, 123,567 sq.ft. Project Value: 30m |
12 |
Proposed construction of market shades, restaurants, Water Tank Towers, and Biodigester at Kuinet Market in Uasin Gishu County, 99,456 sq. ft. Project Value: 35m. Status: Completed |
13 |
Block 12a Supply, Installation and Delivery of Routers, Fiber Optic Cables, Tools, Accessories, Perimeter Fence Lighting, CCTV, and Access Control System. Contracted By Tullow Kenya Operation B.V |
14 |
Construction of Cheplasgei-Kongnyalit (Lavoi) Box Culvert. Value: 15,456,072.00 KSH. Contract Period: 12 Months. Completion Year: December 2022 |
15 |
Improvement to Bitumen Standards of Lot 03 Road (Siaya Urban Area). Value: 12,808,807.00 KSH. Contract Period: 12 Months. Completion Year: December 2022 |
16 |
Performance Based Contract for the Maintenance of Siaya Ruamwa (B136) Road. Value: 34,896,206.34 KSH. Contract Period: 12 Months. Completion Year: December 2022 |
17 |
Routine Maintenance of Lot 6 Roads in Eldoret Town, Uasin Gishu County. Value: 26,680,150.00 KSH. Contract Period: 12 Months. Completion Year: December 2020 |